When the Grid Can’t Keep Up: A Partner Perspective

by Editorial Staff

Ameresco
Gorodenkoff/Shutterstock.com
November 20, 2026
Share

Data centers get most of the attention, but they aren’t the only facilities stuck waiting on the grid. Manufacturers, campuses and other large energy users face the same problem: utility connections that can take four years or more.

In this episode, sponsored by Ameresco, Elisa Wood speaks with Greg Caplan, Senior Vice President – Federal and Utility Solutions Business Development at Ameresco. They discuss the new Ameresco and Energy Changemakers report, When the Grid Can’t Keep Up: Why Large-Load Developers Are Becoming Their Own Power Suppliers.

Greg explains why power has moved from a line item on the budget to the thing that decides where and when a facility gets built. He describes how onsite generation can serve as a “bridge and a blend.” It powers a site and earns revenue years before the grid connection arrives. He also covers how to size a system that starts at 5 MW and grows to 300 MW without overbuilding, and what Ameresco’s work on military microgrids teaches about serving mission-critical commercial loads.

Transcript

Elisa Wood

Hey everyone, Elisa Wood here. MRSCO and Energy Changemakers have released a new report when the grid can’t keep up: Why large low developers are becoming their own power suppliers. It looks at what happens when data centers and other large energy users need power faster than the grid can deliver, and why onsite generation, microgrids, and other distributed energy resources are moving from backup to a much bigger role. Today, I’m with Greg Kaplan, Senior Vice President, Federal and Integrated Power Solution Business Development at Ameresco, and he’s here to discuss the report with me. Hey, Greg, how are you today?

Greg Caplan

Good afternoon. Doing well, thank you.

Elisa Wood

Fantastic. So let’s dive in. The paper says AI is fundamentally an electricity story, but Amoresco serves many large energy users beyond data centers. What are you hearing from manufacturers, campuses, and other big facilities about power becoming a limit on their growth?

Greg Caplan

Well, electricity has moved from a cost line item to a siding and schedule constraint across sectors. Expansion plans are gated by utility timelines rather than by demand, capital or permits. So data centers are the loudest example, but the same physics applies to any facility that needs tens of megawatts on a fixed schedule.

Elisa Wood

I like the fact that you said data centers are the loudest because they definitely are sucking up all the oxygen in the room these days. Every conversation seems to involve data centers. But for a company that’s planning a new facility or an expansion, even if it’s not a data center, a grid connection that takes four years or more can really undermine the whole business case, right? What are their options? What else can they do?

Greg Caplan

Well, I wouldn’t treat the problem as grid or no grid. Treat behind the meter solutions as a bridge and a blend, possibly islanding, but bridge power can get onsite generation providing mission support first and then grow into a grid connection when it arrives. So the site earns revenue from onsite generation years before the utility connection arrives. So a phased or flexible interconnection can allow for a ramp over time. So site selection is key. Choosing sites where power is already deliverable, of course, is preferable, but fuel and equipment access also constitute an important priority. Site needs to have access to fuel and storage and demand flexibility can also serve a purpose and shrink the peak that utilities must serve and that can shorten the study process. But none of these is free, so each of the solutions has cost and benefits to take into account.

Elisa Wood

Yeah, let’s get into that a little bit. I’m curious about when a large customer decides to bring some of its own power to build on site. How do you determine the right mix of grid supply, onsite generation, storage, renewables? How does that come about?

Greg Caplan

We start with the load profile and the reliability requirements rather than the technology. We want to know how much of the load is truly twenty four seven, what an outage costs per hour. Firm onsite generation covers the base and the reliability gap. Storage can contribute to handling transient loads and peak shaving. And then of course renewables lower fuel burn and emissions, but they rarely carry a high load factor site alone. The grid is the balancing partner and supplies lower cost energy when available and backup when it isn’t, assuming the interconnection agreement allows it. So we model a portfolio of solutions over 15 to 20 years taking into account fuel price exposure, equipment availability, emission requirements, and how the utility zone supply is likely to evolve. And then we pressure text that against the failure cases with fuel interruption or an engine fleet outage or a delayed grid connection.

And so it’s with all these factors in mind that we develop a customized solution for the site.

Elisa Wood

That’s a really interesting point because I assume there are some customers that come to this initially with, oh, I want 30% renewables or I want so much grid power, and obviously that’s coming at it backwards.

Greg Caplan

Yes. And it’s not uncommon for a customer to want or to have objectives that are not necessarily consistent with one another. The one to come to mind is the speed to power. I need speed to power behind the meter generation and I want to pay whatever I would pay for standard utility expenses at most. And oftentimes speed to power does in fact come at a cost premium.

Elisa Wood

As speed with most things does. So in the report we talk about a facility that needs five megawatts, a five megawatt microgrid actually. It needs it now and then 300 megawatts later on. How does a company invest in onsite power now without overbuilding or boxing itself in?

Greg Caplan

Well, that’s where modularity comes in. So we want to start meeting the near term requirement with an eye towards the infrastructure and backbone that’ll support expansion. And we can plan for a phased expansion, spend early on infrastructure that can serve future phases and on parts of the solution that are hard to retrofit once you put them in place, like fuel supply or switchgear, and then defer the investment on parts that scale with the phased capacity like individual generation units. So we structure the commercial deal to match that ramp, the phased ramp, and capacity commitments and payments step up as the load steps up rather than binding the customer to 300 megawatts from day one, for instance. So it’s about having a plan for phasing the transition to the grid and deciding upfront whether onsite generation serves as primary or will ultimately be backup or a flexible asset once the grid arrives.

And then of course it’s key to secure future equipment slots early. That’s becoming an absolute must to know what you can deliver when you have to know what equipment you’re deploying and you can’t know that until you secure the equipment slots.

Elisa Wood

And when you say equipment slots, you mean the ability to order the equipment, the timeline?

Greg Caplan

Yes. It’s essentially reserving equipment that’s not yet been manufactured. So manufacturing slots are when a particular piece of equipment is actually going to be made. It’s often reserved for a customer before it’s even produced, and especially where we are now with the supply chain.

Elisa Wood

Right. Makes it crucial. So my next question is an easy one because it’s multiple choice. I’m really curious, what are the biggest practical constraints on building large amounts of power behind the meter? Is it fuel supply? Is it permitting? Is it land equipment, interconnection financing? Which of those tend to become the bottlenecks?

Greg Caplan

Yeah, it’s difficult to say one or the other across the board because they all contribute. So all of the above is the answer I’d have to go with if we’re sticking with that format. With equipment, the lead times from manufacturers change by the day. And so until you have deposits down on equipment, you can’t be sure what you’re deploying or when it’ll arrive. Fuel supply and pipeline capacity of course are drivers of defining what’s even possible for a site. And so if you can’t get access to fuel supply, it’s really going to constrain the solution you can deliver. And then permitting, especially air permits, can really shape your path forward and also get in the way depending on what your objectives are. But certainly emissions at scale are difficult to achieve without a clear path to permits.

Elisa Wood

So what does this all mean to my relationship with my utility? Does it complicate it? Does it ease it? I think we mentioned in the paper some research that suggests customers who actually bring solutions like this can get faster into connection. So what happens with the utility here?

Greg Caplan

We are fortunate in that we partner with utilities nationwide for a range of services and programs, and in some cases we are a preferred microgrid developer for a utility partner. And that means that when we have a customer within the service territory of a utility partner that sees us as a microgrid supplier, we’re able to bring our end user customer to the table with the serving utility to design a solution that’s going to serve the utilities objectives as much as possible alongside the customer’s objectives. So what we try to turn these projects into is a win-win-win. Utilities are capacity constrained, and to the extent new generation capacity can be brought up online in harmony with utilities planned, they want to facilitate that. And that’s what we’re seeing, especially in those service territories where we’re already partnered.

Elisa Wood

So let’s talk now about your military projects because Amerisco is really known for… It’s one of the things that Amerisco is known for, it’s military projects. They’re often used as case studies on resilience and onsite power. You see them all over the place. What have those projects taught you that is directly relevant to the hyperscale data centers now? How do they relate? And other mission critical loads too, not just data centers.

Greg Caplan

Yeah. And mission critical is the key where we are experienced in keeping missions powered when the grid goes down. That’s really the long and the short of it. We are a partner to the US military on a number of installations where we do keep the missions powered when the grid goes down. And so that is the expertise that we bring to the discussion of supporting data center and other mission critical loads in the commercial space where islanding capability has to be tested regularly and we have to prove that the performance of the microgrid will be up to snuff when the grid goes down. Cybersecurity is inseparable from power. That’s another important lesson and best practice that transfers directly from our military work to the commercial sector. And these long-term contract structures, it’s not just in the technical solutions, but also in the contracts that we put in place and lessons learned from developing these distributed generation microgrid projects on military installation certainly serve our purpose as well when dealing with commercial clients.

Elisa Wood

So many parallels, it sounds like.

Greg Caplan

Absolutely.

Elisa Wood

So here’s my last question. If you were advising a company today that’s planning a major new load, what is the most expensive mistake you tell them not to make?

Greg Caplan

I would say waiting because power is, it’s a critical element in any development and knowing the path to power, how much power will be available to support the mission at what point is critical. So the data center space in particular has been transformed, but also as we said at the top of the interview, any sector that’s bringing a large load online at a new facility is going to have to plan for power and doing it sooner rather than later is going to make the plan that much more plausible in terms of when a mission can be powered at a new facility. So waiting I would say is the most expensive mistake and committing to a single solution could also close the door to optionality that, as we’ve discussed, is really important in terms of bringing to bear all the different technologies and planning strategies that could support an effective development.

So I would say making the best use of your time to look at all available options is the way to avoid expensive mistakes.

Elisa Wood

So when you say single solution, would an example be someone that’s just putting in all gas fired generators and not using –

Greg Caplan

Exactly. Without taking into account the potential for storage or even if we’re talking about planning on bringing capacity online into the next decade, looking potentially at what nuclear can do. So locking into a particular solution too early could close yourself off unnecessarily to what could be more cost-effective or reliable solutions in the future.

Elisa Wood

Fantastic. And hey, I want to let our viewers know that there’s a lot more in the report than what we discussed, including data on the growth of onsite generation, the mix of firm power, renewables and DERs, and examples of how these systems are being deployed today. So if you would like to read the report, please visit energychangemakers.com to download when the grid can’t keep up. And Greg, thank you very much for joining me today. Appreciate your time.

Greg Caplan

Yeah, pleasure to speak with you. Thank you for the invitation.

Elisa Wood

Thank you for joining us today on the Energy Changemakers Podcast. I hope today’s conversation has inspired you to think differently about the role of distributed energy in our society. If you enjoyed this episode, please subscribe to our podcast on your favorite platform and consider leaving us a review. You can help us shape the dialogue around energy. Go to energychangemakers.com, subscribe to our newsletter, and join our community. Together, we can make a real difference in how quickly we can make our grid local, equitable, and clean.

Morgan Stanley Puts a Price on Speed to Power — and Distributed Energy Wins Big

The findings challenge a longstanding assumption in the energy industry: that electricity delivered by the grid is generally the least expensive option.

Elisa Wood
speed to power

Calling Distributed Energy “Rinky-Dink” Gets the Grid Wrong

Local solar, batteries, EVs and virtual power plants aren’t sideshows. They’re becoming core grid resources.

Elisa Wood
energy abundance

Goldman Sachs Makes a Bigger Bet on Distributed Energy

In a deal that speaks to the changing role of distributed energy,  Goldman Sachs Alternatives has agreed to acquire RWE’s US distributed generation business.

Elisa Wood
Subscribe to our free weekly newsletter about all things distributed energy.
Subscribe

Top Podcast

Can Better Energy Choices Reverse the Data Center Backlash?

After decades covering data centers, journalist Rich Miller sees an industry struggling with public opposition, enormous energy demands and a growing realization that local energy may be part of the solution.

Latest Resources

Energy Changemakers Media Kit – The Voice of Distributed Energy

About Energy ChangemakersEnergy Changemakers is a journalist-led media and content platform built exclusively for the distributed energy and grid-edge market. At its core, the company operates at the intersection of: Our mission is to Educate. Elevate. Amplify.

How Supercaps Can Help Solve the Geopolitical Challenge of Battery Over Deployments

The speed-to-power movement is driving decision-making in the data center industry as it searches for near-term solutions to its power supply needs. The inability of many utilities and wholesale market control areas to bring new capacity on-line in a timely manner has prompted many data centers to go behind-the-meter (BTM) and create microgrids and other […]
Large Load Developers Becoming Their Own Power Suppliers

When the Grid Can’t Keep Up

Headlines are everywhere about the electric grid straining under a surge in demand from data centers and other large loads. But the more urgent story is: How can the grid evolve to meet this new demand at speed?

Ultra-Reliable Onsite Generation: How Enchanted Rock Delivers

Many organizations are reassessing how they approach electric power. If the grid cannot deliver the reliability — or even the access — modern operations require, what alternatives provide resilience without compromising environmental performance or community well-being?

RSS feed: Microgrids Now Microgrids Now

  • Time to Revisit the NJ Transit Microgrid?
  • A New Democratic Proposal Would Eliminate Key Microgrid Limitation
  • New Hampshire Looks to Clear the Way for Microgrid Projects
  • Texas Judges Back Enchanted Rock Bridge-to-Power Project, With a Catch
  • A Real Community Microgrid, At Last?
The Voice of Distributed Energy
Learn about grid edge opportunities
Subscribe
Energy Changemakers
Energy Changemakers
600 Twentyninth Place Ct #1055
Charlottesville, VA 22901
elisa@energychangemakers.com
© Wood Energy Writers LLC. All rights reserved.
  • Terms of Service
  • Privacy Policy